Cafe · Chapter · 8 questions
Setting up
How do I fit out and equip a cafe without overspending?
Between signing the lease and the first customer, most of a cafe's money is spent in a few weeks: equipment, counter, interiors, contractor, billing. This chapter goes in the order the decisions should be made. First the equipment your menu actually needs and what each piece costs, then the espresso machine (new or refurbished, one group or two). Then the counter and kitchen layout, which has to be fixed before plumbing and power. Then the interior, spent where customers notice it, and the contractor, paid against finished work. Last, the billing system and the two weeks of trials before opening. A chai counter, a specialty coffee bar and a bakery cafe spend very differently, so each page shows where the type or size changes the answer.
Useful when you want to: start one
- 01CafeWhat equipment does a cafe need, and what does it cost?A typical cafe needs about a dozen working pieces: an espresso machine or chai station, one or two grinders, an under-counter fridge, an ice machine and blender if you sell cold drinks, a griller or oven for food, a water filter, a billing kit, and the small tools behind the counter. New, the coffee and kitchen equipment alone usually costs anything from about a lakh for a chai counter to several lakh for a full coffee bar, inside a total fit-out of ₹6–20 lakh. Buy what your menu needs on day one, size it to your busiest hour, and leave everything else until sales tell you to.
- 02CafeHow much does each piece of cafe equipment cost in India?What a cafe's espresso machine, grinder, fridges, ice machine, blender, display chiller, oven, water filter and billing kit cost new in India, with what to check before buying.
- 03CafeWhich espresso machine should a new cafe buy, and should it be second-hand?Choose the machine for your busiest hour and for the service you can get in your city, not for the brand. Most new cafes that sell coffee as a main item want a two-group machine, which costs about ₹1.7–3.6 lakh new; a counter selling mostly chai or fewer espresso drinks can start on one group at about ₹0.8–2.2 lakh. A refurbished machine can save a lot, but only from a dealer who rebuilds it, gives a written warranty and has an engineer near you. Budget the grinder, water treatment and a service contract at the same time, because they decide the coffee as much as the machine does.
- 04CafeHow should a small cafe kitchen and counter be laid out?Lay the counter out as a line the order travels along: take the order and payment, make the drink, hand it over, with everything a barista needs for a drink within one step. Keep milk, ice and cups under or beside the machine, keep the dirty-dish path away from the pickup point, and keep the kitchen's hot work under the exhaust. Kitchen, counter and storage usually take about 30–40% of carpet area of a cafe's carpet area. Draw it to scale and walk through a rush on paper before any carpenter starts.
- 05CafeHow do I design a cafe interior on a budget?Spend on the few things every customer touches or sees from the door, the counter, lighting, seating and the signboard, and keep walls, ceiling and floor simple and durable. Interior fit-out in Indian cities runs about ₹900–4,500 per sq ft of carpet area of carpet area, and the low end is enough for a good-looking cafe if the money goes to the right places. Plan the counter and kitchen first, because moving plumbing later costs more than any decor. Leave anything you are unsure about until the cafe has traded for a few months.
- 06CafeHow do I hire a cafe fit-out contractor and stop the budget running over?Get final drawings and a bill of quantities (BOQ) first, so every contractor prices the same work, then compare at least three quotes line by line. Pay a small advance and the rest against finished milestones, hold back a part until snags are fixed, and agree in writing that no extra work is done without a priced change order you sign. Most overruns come from work that was never in the drawings, so the cheapest fix is to finish the design before anyone picks up a hammer. A cafe fit-out usually takes 5–7 weeks once drawings are final.
- 07CafeWhich billing, POS and inventory tools does a cafe need?A cafe needs a billing system that prints GST-correct bills with its FSSAI number, sends orders to the kitchen (KOT), takes UPI and cards, and gives a daily sales report you can reconcile; stock tracking by recipe is the next most useful feature. Software for one outlet costs about ₹2,000–25,000 per outlet per year a year, and the hardware (tablet or terminal, printers, cash drawer) is a one-time cost on top, priced in the equipment price table. Choose for how fast it bills at the rush and how good the local support is, not the length of the feature list.
- 08CafeWhat does a cafe need ready in the last two weeks before opening?In the last two weeks a cafe should have its licences in hand, every machine installed, tested and cleaned, recipes written and costed, the billing system loaded with the real menu, the first stock ordered against a small opening menu, and staff trained through at least two full trial services. Hold a soft opening for friends and neighbours before the public one. Anything still being built or applied for at this point is the thing most likely to delay opening day, so check it first.