Dhaba or highway restaurant · Chapter · 4 questions

Land, access and approvals for a dhaba

What does a highway dhaba need in land, access and permissions before it opens?

A roadside shed is the easy part of a dhaba. The hard parts are a plot you can hold, a legal way onto the road, room for a truck to turn and a toilet block that decides whether families stop. This chapter goes through them in the order a first-time owner should: land first, access second, parking and services third, then the approvals. The general pages on choosing a location and on lease terms sit alongside, because most of that advice applies and only the road changes.

Useful when you want to: start one

  1. 01Dhaba or highway restaurantWhat land, parking and permissions does a highway dhaba need?A highway dhaba needs a plot you can legally hold, a legal way onto the road, room for trucks and cars to stop and turn, and your own water and power. The access permission is the step most first-time owners skip: on a national highway it carries ₹10,000 processing fee, ₹20,000 for provisional approval and a ₹2.5 lakh one-time licence fee, plus a ₹2.5 lakh bank guarantee until the access road is built (2020 rates, rising 5% a year). Land is the first decision and the biggest capital line, so settle it before the shed, the menu or the loan.
  2. 02RestaurantHow do I pick a location for a restaurant?Pick a restaurant site in this order: who lives or works within reach (QSR 1-2 km; casual 3-5 km; fine dining 5-10 km), whether enough people walk or drive past at the hours you need (Under 100 reject; 100-200 marginal; 200-400 good; 400+ excellent), whether diners can park and find the door, and only then the rent. Then check the building can take a kitchen: an exhaust route, gas, drainage, power and a legal use. A cheap unit that fails the building test costs more than an expensive one that passes.
  3. 03RestaurantWhat should a restaurant negotiate in its lease: rent-free fit-out period, lock-in, escalation, renewal?A restaurant spends most of its money fitting out a space it does not own, so the lease must protect that money. Negotiate a rent-free fit-out period (shop leases commonly give 1–3 months), a lock-in no longer than you can bear (often 1–3 years), a capped yearly increase, a renewal right, a deposit near the lower end of 6–12 months of rent, and written rights for the exhaust, gas, signage and grease trap.
  4. 04RestaurantWhat should a property have to work as a restaurant: exhaust route, water, drainage, power load, gas, washrooms?A restaurant property needs a route for the exhaust duct to open air, gas that can be brought in safely and not in a basement, drainage with a place for a grease trap, enough electrical load (often three-phase), plenty of water, washrooms and a legal use. Check these before you pay rent, because retrofitting an exhaust or gas line after the lease is the most expensive mistake a new restaurant makes.

Menu

Read

Ask an expert Ask an expertFree, real peopleHub
Ask an expert