Restaurant · 4 min read

What must my landlord allow for a restaurant: cooking, exhaust, signage and outdoor seating?

The short answer

Before you start the fit-out, get the landlord's written permission for commercial cooking, LPG cylinders, the exhaust duct route, signage, outdoor seating if planned, music if planned, and the papers each licence needs. A building that cannot say yes to the exhaust cannot host a restaurant, so settle that first. Ask for these in the lease or a signed side letter, not a phone call.

Not sure about your case? Ask an expert, free ↓

Why do I need permissions beyond the lease?

The fit-out is half done and the building's secretary writes: 'no smell, no smoke from our shaft.' You have a lease for a shop, not for a restaurant kitchen, and the lease said nothing about cooking. A general NOC for a shop lets a business operate; a restaurant needs a bundle of specific permissions that most landlords have never been asked for. The general landlord NOC page, landlord NOC, covers the basic paper every licence asks for; this page covers what is specific to a kitchen.

What permissions does a restaurant need, one by one?

PermissionWhy you need itWhat to get in writing
Commercial cooking and gasA shop lease may allow trade but not a kitchen or LPG. LPG kitchens are barred from basements under the 2026 building code, and cylinders must be 19 kg commercial ones (Not allowed; use the 19 kg commercial cylinder)The right to cook, to store and use commercial cylinders, and where the bank may sit
Exhaust duct and make-up airSmoke and grease have to reach open air; Mumbai's rules want the outlet at least a metre above the structureThe route, the outlet point, who maintains it, and a right to use shared walls or shafts
Grease trap and drain accessThe drain is shared; grease blocks itWhere the trap sits and the right to clean it and to move waste out
SignageFootfall depends on being seenThe size, the position, lighting and who pays for any hoarding
Outdoor seating or forecourtIt adds seats but may belong to the landlord or the municipalityWhether it is included, extra rent, and municipal approval
Music, noise and timingsLive music and late hours draw complaints; music needs its own licences, see music licencesPermission for music, hours and a cut-off, and noise limits
Licence papersFSSAI, fire, trade and liquor ask for ownership papers, a NOC and sometimes consent from neighboursA duty to sign what an authority needs, with a timeline
Generator, tanks, condensersNeeds space, outdoors, and power connectionsWhere each goes, and the right to run the generator

What does the building or society control?

Where the landlord is a person, a residents' society or a mall owner often has the final say. A society can bar commercial cooking, set hours, charge for the use of a common shaft and refuse signage. Ask for the society's rules and for its written consent before you pay the token amount. In a mall, the leasing team will hand you a fit-out manual: read it for the exhaust route and the working hours before you sign.

The zoning rule sits above all of these. Check whether the use is permitted in that location under zoning and commercial use; a landlord's permission cannot override a master plan that does not allow a restaurant on that road. And if 50 or more people can gather, the fire authority has its own view: see fire NOC.

How do I get it all in writing?

  1. Put the permissions in the lease as a schedule, or in a signed side letter that the lease refers to.
  2. Make licence papers a condition of rent starting: the rent-free period begins only when you have the landlord's signed documents for each application.
  3. Ask for a clause that if an authority refuses a licence because of the landlord's building, you can exit and get the deposit back.
  4. Photograph the exhaust route with the landlord and mark it on the drawing that goes into the lease.
  5. Keep one clear copy of the signed permissions; you will need it for each inspection.

If you are comparing sites, treat the landlord's attitude to these as a signal. A landlord who delays a signature for a licence is one who will delay renewals and repairs.

What usually goes wrong

  • Taking a verbal 'yes' on the exhaust and being told no after the tiles are down.
  • Assuming a general NOC covers cooking, gas, signage and music.
  • A society that wakes up to the smell in month two.
  • A landlord who stalls on the signature a licence needs, so your trade licence is late and rent is running.
  • Putting a sign on the wall that belongs to the neighbour.

This is general information, not legal advice. Have a lawyer check the permissions schedule before you sign.

Questions people ask

Can a landlord stop me cooking in a rented shop?

Yes, if the lease or the building's rules do not allow it. A shop lease does not automatically allow a kitchen, LPG or a duct. Get it in writing.

Does a restaurant need a NOC from neighbours?

Some licences, particularly liquor and music, may need neighbour or society consent, depending on the state and city. Check with the issuing office for your city.

Who pays for the exhaust duct route through the building?

Normally the tenant builds and maintains it, but the landlord must allow the route. Agree it in writing before the fit-out.

Can I put a signboard on a rented shop?

Only where the lease or the landlord allows, and subject to local rules. State the size and position in the lease.

This is general information, not legal advice. Have a lawyer read any agreement before you sign it.

Where these numbers come from

  1. Domestic 14.2 kg cylinder for a restaurant: Not allowed; use the 19 kg commercial cylinder (India, LPG (Regulation of Supply and Distribution) Order 2000 clause 3(1)(c)). Official source: LPG (Regulation of Supply and Distribution) Order 2000, clause 3(1)(c), checked 14 November 2026.

Fees, rates and rents change. Check the official source before you pay or sign anything.

Place and setup · Restaurant

More on place and setup for a restaurant

14 pages on this. You are on number 14.

  1. How big should my restaurant be, and how many seats do I need?
  2. What fire safety, grease trap and gas safety does a restaurant kitchen need?
  3. How do I design a restaurant dining room and seating on a budget?
  4. How much rent can a restaurant afford for its expected sales?
  5. How do I hire a restaurant fit-out contractor and stop the budget running over?
  6. What should a property have to work as a restaurant: exhaust, water, drainage, power, gas and washrooms?
  7. What should a restaurant negotiate in its lease: rent-free period, lock-in, escalation and renewal?
  8. What must my landlord allow for a restaurant: cooking, exhaust, signage and outdoor seating?
All 14 on place and setup →

Reading about it is one thing; doing it in your restaurant is another. If you'd like a hand choosing and setting up the right place, tell us where you are and a person will reply, free.

Get help with this ↓

What now?

Menu

Read

Ask an expert Ask an expertFree, real peopleHub
Ask an expert