Hire a site engineer first, then a site supervisor or foreman, and an accounts person once the second site opens. Skilled labour such as masons, carpenters and bar benders usually comes through gang leaders or labour contractors rather than as salaried staff, and that choice carries compliance duties.
Pay varies a lot by city and by whether the person has handled concrete work, tenders and measurements. The figures below are rough estimates for small and mid-size firms and should be checked against your local market. A cheap hire who cannot read drawings or measure work costs more than a good one.
The order in which to hire
| Order | Role | What they take off your plate |
|---|---|---|
| 1 | Site engineer (civil) | Reads drawings, sets out the building, checks reinforcement and shuttering, takes measurements for running bills |
| 2 | Site supervisor or foreman | Runs labour on the ground, handles attendance, material receipts and daily work plan |
| 3 | Accountant / accounts and billing executive | Wages, supplier bills, GST, TDS and client running bills; keeps site-wise costs |
| 4 | Store-keeper or material controller | Receives, counts, stores and issues materials; stops leakage |
| 5 | Estimator or tendering engineer | Takes off quantities, builds rates and tender documents, once you bid for public or commercial work |
| 6 | Safety officer or safety supervisor | Takes responsibility for site safety routines; some sites and sizes require one by law, so confirm |
| 7 | Project manager or planning engineer | Programme, coordination and client reporting across three or more live sites |
If you are the owner and an engineer, you can cover the estimator role for a long time. If you are not, hire the site engineer first and spend time on site yourself until you trust their measurements.
What to pay: a rough guide
| Role | Tier-1 city, per month | Tier-2/3 city, per month |
|---|---|---|
| Site engineer, diploma or B.E./B.Tech, 2–5 years | ₹30,000–55,000 | ₹20,000–38,000 |
| Site supervisor or foreman | ₹22,000–40,000 | ₹16,000–28,000 |
| Accountant with Tally and GST | ₹25,000–45,000 | ₹16,000–30,000 |
| Store-keeper | ₹15,000–25,000 | ₹12,000–20,000 |
| Estimator or quantity surveyor, 3+ years | ₹35,000–65,000 | ₹25,000–45,000 |
| Safety officer | ₹30,000–55,000 | ₹22,000–40,000 |
Skilled workers on the ground are paid by the day or by the piece. Day rates for a mason, carpenter or bar bender vary widely by city, trade and season, so ask three local labour contractors for current rates instead of trusting a printed figure. Helpers are paid less. Keep a register that matches attendance with wage payments.
Wages and minimum pay for construction work are set by state governments and change by notified rates. Confirm the current minimum wage for your area and worker category with the labour department or a consultant. This is not legal advice.
Labour gangs and labour contractors
Most small sites do not hire masons and carpenters one by one. They deal with a gang leader or thekedar who brings a team. This is practical, and it also comes with duties.
| Arrangement | How it works | What to watch |
|---|---|---|
| Own muster-roll labour | You hire, record attendance and pay wages directly | More paperwork and employer duties, but control and loyalty. Fits long-term crews |
| Labour-only contractor (thekedar) | You pay a rate per sq ft, per cubic metre or per day, and he pays workers | You may still be a principal employer for wages, welfare and safety, depending on the law. Confirm how it applies to you |
| Piece-rate or item-rate gang | A gang does centring, bar bending or plastering at an agreed rate per unit | Quality and rework disputes; measure before paying and keep a written rate list |
| Material-plus-labour sub-contractor | A specialist (waterproofing, electrical, plumbing, tiling) does the full item | Check their licences, references and who is liable for defects |
Whichever route you pick, keep a record of every worker on site: name, trade, attendance, wage and who engaged them. Contract labour licensing, welfare cess and the labour codes have recent and changing rules, and records are what the labour department looks at first. See the playbook's compliance section for the registrations to ask about.
A gang that stays with you across several projects is the real asset. Pay on time, advance modestly, and settle accounts clearly before festivals or harvest, when many workers travel home and return late.
How to find and vet each hire
- Site engineer. Ask for a short site walk-through instead of a long interview. Show a set of drawings and ask them to explain the reinforcement schedule, where the slab shuttering must be checked, and how they would take the measurement for one wall. Check references from earlier employers.
- Supervisor or foreman. Ask about the largest crew they have managed, how they handle absenteeism, and how they check what arrived on a truck against what was ordered. Good foremen name their problems honestly.
- Accountant. Give a sample bundle: supplier bills, wage sheets and a running bill. Ask them to code it, show GST input, TDS and the net amount due. Test with a deliberate mistake, such as a duplicate bill.
- Estimator. Give a small drawing and a price list and ask for a quantity take-off and a rate analysis in a sheet. Check the logic, not just the number.
- Store-keeper. Do a counting test on a mock delivery. Look for care, not speed.
Places to look: civil engineering colleges and polytechnics for fresh hires, local contractor associations and building material dealers for experienced supervisors, a CA firm for accountants, and referrals from architects for estimators. Pay a small trial period or a paid trial task before a long commitment.
Employee, contractor or freelancer
| Role | Salaried employee | Freelance or consultant |
|---|---|---|
| Site engineer | Yes, on site daily | Rarely; an outside engineer can supervise only visits, not run a site |
| Structural engineer | No | Yes, a design consultant, and the engineer of record for design and structural decisions. Do not substitute your own judgement |
| Accountant | Yes once volume grows | A CA or part-time bookkeeper works well for 1 to 2 sites |
| Estimator or tender writer | Yes once you bid regularly | Per-tender consultant while you bid occasionally |
| Safety officer | Yes on larger sites | Visiting consultant may be enough for small sites; confirm what the law and the client require |
| Drone or survey, material testing, quantity surveyor | No | Yes, per job |
Put terms in writing: duties, reporting line, notice period, confidentiality for your rate sheets and client lists, and what happens to site documents when someone leaves. EPF, ESI and gratuity apply based on headcount and wages; check with a CA or consultant.
Retaining people and common mistakes
- Hiring a friend as site engineer with no written targets. Set weekly measures: slab pours on schedule, snag count, material wastage against norm.
- One person holding cash, receiving material and recording it. Split the roles even on small sites.
- Paying wages late. Labour moves to the next contractor within a week.
- Letting the supervisor negotiate rates alone. Keep a written rate list and approve exceptions.
- No handover. Every site should have a one-page daily report that anyone can pick up.
Software helps with attendance, wage sheets and material tracking; see software for a construction company. If you also fit out interiors on projects, read how interior design firms hire; the trades overlap but the roles differ.
Before you hire anyone
More on starting a construction company
- Start hereThe full playbook →Models, licences, startup costs and the steps to your first customer.
- Go deeperWhat to buy →Shuttering, scaffolding and small machines costed: what to own, what to hire, what to skip.
- Go deeperGetting customers →Architects, plot owners and tenders: how a small contractor wins its first ten jobs.
- Go deeperFinding suppliers →Cement, steel, sand, RMC and hire machinery: where to source, how to vet, credit terms and red flags.
Questions people ask
Who should a new contractor hire first?
A site engineer who can read drawings, set out the work and take measurements. Then add a site supervisor or foreman to run labour daily, and an accountant when you have two live sites. Many owners cover estimating themselves at first. Hire for the weakest link in your own skills.
How much does a site engineer earn in India?
As a rough estimate, a site engineer with a few years' experience earns about ₹30,000–55,000 a month in a large city and ₹20,000–38,000 in a smaller town, before PF and ESI. Fresh graduates earn less, and pay depends on the size of the project and the person's skills. Check local offers.
Do I need a contract labour licence if I use a thekedar?
It depends on the number of workers, the arrangement and your state, and the labour codes are changing the rules. A principal employer can have duties for contract labour even when a contractor supplies it. Ask your state labour department or a labour consultant before mobilising. This is general information, not legal advice.
Should labour be on my payroll or a contractor's?
Small firms often use gang leaders for skilled trades and keep core supervisors on payroll. Payroll gives control and loyalty but adds EPF, ESI and records duties. A contractor shifts the day-to-day, though you may still carry responsibility. Choose per trade, and keep attendance and wage records either way.
How do I test a site engineer before hiring?
Give a site drawing and ask for a walk-through: what to check before a slab pour, how to measure a wall, how to compare delivered steel against the order. Use a paid trial week if needed. Ask references what they actually managed, not just their title.
