Buy modules and inverters from manufacturers' authorised distributors, structures from a local galvanised fabricator you can visit, and cable and protection gear from established electrical wholesalers. Before paying anyone, check the module model and cell source against the current MNRE approved lists and ask for warranty terms in writing. Supplier quality is the largest driver of callbacks.
You will deal with five supplier types with different rules and risks. Approved-list requirements, tax rates and prices change, so each point below is a method to follow, not a fixed fact; confirm current status before ordering.
The five supplier types and what each is checked for
| Supplier | What they supply | What to check |
|---|---|---|
| Module manufacturer or authorised distributor | Mono PERC or TOPCon modules of 500 to 600 watts and above | Model on the MNRE ALMM list where applicable, BIS registration, serial numbers, flash test report per batch, warranty terms |
| Inverter distributor or service partner | String inverters, hybrid inverters, Wi-Fi or GPRS loggers | BIS and grid-code compliance where required, local service centre, spare availability, app or portal quality |
| Structure fabricator | Galvanised mild-steel or aluminium mounting for flush or elevated roofs | Galvanisation thickness, wind-load design, fastener grade, delivery to roof dimensions |
| Electrical wholesaler | DC solar cable, AC cable, MC4, DCDB and ACDB, MCB and SPD, earthing kit, lightning arrestor | Make and standard marks, cable conductor genuineness, certificates for protection devices |
| Battery and hybrid supplier (later) | LFP or lead-acid batteries, hybrid inverters | Cycle-life and warranty claims, BMS compatibility, safety certification |
Do not use one supplier for everything. Keep at least two for modules and two for inverters so a stock-out or price jump does not stop your jobs.
Approved lists and certification: the check that cannot be skipped
Government-linked rooftop work, including household subsidy installations, has been tied to modules and, more recently, solar cells from lists maintained by MNRE. Secondary sources describe a cell-level requirement taking effect around mid-2026, with exemptions and some conflicting accounts, and I could not confirm the primary orders. So the safe workflow is a fresh check per job.
- Look up the exact module model and manufacturer on the current MNRE ALMM page before quoting any government-linked or net-metered job. Save a dated screenshot or PDF in the job folder.
- Ask the supplier for the cell manufacturer and the domestic-content declaration if the job needs it; a module from a listed maker is not automatically compliant if the cells come from an unlisted source.
- Match serial numbers on the delivered modules to the supplier's invoice and flash report. Record them in your stock register.
- Check BIS registration on inverters and modules where applicable, and ask for the certificate number to verify on the BIS portal.
- Ask the DISCOM or empanelment office which documents they require for the specific scheme at the time of the application.
Rules on approved lists, domestic content and scheme-specific logos have changed repeatedly. Treat anything here as a prompt to verify on mnre.gov.in, pmsuryaghar.gov.in and with your DISCOM. This is not legal advice.
Where to find them
- Manufacturers' channel-partner programmes: most major module and inverter makers publish a distributor or installer-partner form on their website. Apply with your licence and GST documents.
- Regional solar distributors in state capitals and larger cities, who stock several brands and sell to installers at distributor rates. Ask for recommendations from two or three local installers you respect.
- Trade fairs and expos such as the large regional renewable-energy exhibitions; useful for meeting makers and comparing models in person. Confirm dates and entry details on each organiser's website.
- Local steel and galvanising units: ask the structure fabricators what zinc coating they achieve and whether they can show a test result.
- Industrial-supply marketplaces and B2B platforms: useful to compare cable and BOS prices; verify the seller and ask for batch certificates.
- Peer installers: a distributor who treats a small installer fairly on a busy week is worth more than the lowest quote.
Terms, credit and warranty claims
Working capital is the choke point. A distributor may offer credit only after a few clean transactions, so negotiate in stages.
| Term | What to ask | Why it matters |
|---|---|---|
| Payment | Advance for the first two to three orders, then a short credit period tied to your job milestones | Your customer's balance may arrive weeks after delivery |
| Module warranty | Product and linear performance warranty periods in writing, as per the datasheet; ask who handles claims in India | Manufacturers often state a product warranty of around a decade or more and a longer performance warranty, but check the datasheet; do not rely on a salesman's memory |
| Inverter warranty | Years offered, whether replacement is on-site or return-to-factory, turnaround time | A dead inverter means a customer with no generation; replacement speed decides your reputation |
| Transit damage | Who bears the cost of broken modules; insist on a delivery inspection before signing | Module glass breaks and micro-cracks are hard to see |
| Price protection | Hold a quote for a stated number of days, and ask for a price-change clause on large commercial orders | Module prices have moved noticeably in short periods |
| Return and swap | Whether unused, undamaged items can go back | Reduces risk of ordering the wrong inverter rating |
Backups and a simple vetting routine
- Order a small first batch and inspect: frames, glass, junction boxes, labels and serial plates.
- Visit the warehouse or fabricator at least once; look at stocking conditions, pallet handling and the quality of welds and galvanising.
- Test the service line: call the inverter helpline with a made-up question and see how quickly and capably it responds.
- Cross-check on installer forums and with two customers of that supplier.
- Keep a supplier sheet with lead times, last price paid, claim history and a rating of one to five for responsiveness.
- Hold a second source for each critical item, ideally from a different city to avoid shared logistics delays.
Red flags
- A module not on the approved list being offered as compliant, or a supplier who cannot say who made the cells.
- Unusually low price relative to other quotes; this can mean old stock, B-grade modules, an unlisted cell source or fake BIS marks.
- Mismatch between the label power and the flash report, or a flash report without serial numbers.
- Copper-clad or thin-conductor cable passed off as full copper; cut a sample and compare the strand count and cross-section.
- Structure steel that is painted rather than galvanised or thin-coated; rust on a roof appears in two monsoons.
- Refusal to put warranty terms in writing or an unwillingness to say who handles claims.
Sourcing affects what you carry and how you price. See what to buy to start a solar installation business for what to hold in stock and who to hire for who inspects deliveries; for GST on invoices, see GST billing software.
More on starting a solar installation business
- Start hereThe full playbook →Models, licences, startup costs and the steps to your first customer.
- Go deeperWhat to buy →Testers, safety gear and a vehicle first; panels per job, not on the shelf; what to skip.
- Go deeperWho to hire →Licensed supervisor first, then crew, survey engineer, liaison and an AMC technician; pay and vetting.
- Go deeperGetting customers →Bill-based quotes, society demos, referrals and local search; launch pricing; AMC for retention.
Questions people ask
How do I check whether a solar module is on the approved list?
Open the MNRE ALMM list on the ministry's website, search for the exact manufacturer and model, and save a dated copy for the job file. For government-linked or subsidised work, also ask the supplier which cell manufacturer was used. Requirements have changed in 2026, so confirm the current rule with MNRE and your DISCOM.
Should I buy from a manufacturer directly or from a distributor?
A new installer usually buys from an authorised distributor, because manufacturers often set minimum order values. Ask the distributor for authorisation proof and the warranty claim route. As volumes grow, apply to the manufacturer's installer-partner programme for better pricing and technical support.
What warranty should I expect on panels and inverters?
Warranties vary by brand and product, and the supplier's current datasheet is the only reliable source. Modules commonly carry a product warranty and a longer performance warranty, while inverters carry a shorter one. Ask who handles claims in India, how long replacement takes, and keep invoices and serial numbers.
Is it safe to buy cheap modules to win on price?
It is risky. Unusually cheap modules may be old stock, B-grade, or fail the approved-list or domestic-content checks, which can block subsidy or net-metering paperwork and leave you carrying the cost. Compare total job cost including callbacks, not just the per-watt price, and never trade away documentation.
How do I get credit from suppliers as a new firm?
Start with advance payments, build a record of timely payment, and ask for short credit tied to your project milestones. Share your licence, GST and empanelment documents. Some distributors extend limited credit after a few clean orders. Never accept credit terms you cannot meet if your customer's balance is delayed.
