What to buy · modular kitchen business · 7 min read

What to buy to start a modular kitchen business

What a modular kitchen and wardrobe business in India buys first: measuring kit, display kitchen, fitter tools, and when a panel saw and edge bander pay off.

Planning this? Ask an expert, free ↓
Nookly room-scale furniture shopping and turnkey interior design
Runs on Nookly · Furniture & interiors

Part of the playbook: How to start a modular kitchen business in India

Buy a laser measure, a CAD and cut-list setup, a working display kitchen and a fitter's tool kit. Send panel cutting, edge banding and drilling to a processing factory until your jobs are steady. A panel saw, edge bander and boring machine only pay back once you are fabricating most of your own kitchens and wardrobes every month.

As a planning estimate, a design-and-install start with a small display can run on about ₹6–14 lakh of owned kit and fit-out, with machines outsourced. A basic in-house line (panel saw, edge bander, boring) adds roughly ₹15–35 lakh, and a CNC router takes it to ₹40–90 lakh. These are ballparks, not quotes. For overall startup costs and licences, read the modular kitchen business playbook.

The measuring and site kit

A kitchen is built to a millimetre and installed against walls that are not square. Most remakes come from three things: a measurement taken before tiling, an unnoted plumbing stub, or a corner that is 12 mm out of plumb. The first purchases are the ones that stop those.

Estimates in ₹ for a one-person start, before GST. City prices and brands vary.
ItemWhy a kitchen maker needs itBallpark cost
Laser distance meter (40–60 m)Wall lengths, diagonals and ceiling height; unequal diagonals tell you the room is out of square₹3,500–10,000
Laser cross-line levelMarking the datum line for wall units and the plinth line on uneven floors₹2,500–9,000
5 m steel tape, 4 ft spirit level, plumb bobChecking walls for plumb and the platform for level before the carcass goes on₹1,200–3,000
Moisture meter and a torchDampness behind sink walls and on outer walls; saves a swollen-carcass call a year later₹1,500–5,000
Graph-sheet clipboard or tablet with stylusSite sketch marking every socket, gas point, water inlet, drain and window sill₹500 or ₹25,000–45,000
Phone with tripodPhotographing each wall before and after, plus a short video of the platform and ceilingExisting phone

Make a one-page site measurement sheet and use it on every visit: platform height and depth, beam and column offsets, window and door openings, gas and water points, chimney duct route, and the client's appliance models with their cut-out sizes. A signed measurement sheet is your defence when a client later says the kitchen is the wrong size.

Display kitchen: what to spend on

Clients decide on drawers they can open, not on a catalogue. A display with two or three live kitchens does more selling than any brochure, and it is usually your largest first spend. Build it to show decisions, not to look like a showroom.

  • One L-shaped kitchen with a real platform, a working sink and a hob cut-out, so clients stand at it and judge counter height and walking space.
  • A tall-unit and pull-out wall, with a bottle pull-out, a cutlery tray, a corner carousel and a tandem drawer set, all working.
  • A shutter-finish wall: laminate, acrylic, PU paint, membrane foil and glass-in-profile side by side, so price differences are visible.
  • One wardrobe bay, with a sliding and a hinged door, a pull-down rod and a drawer insert; wardrobes often follow kitchens.
  • A hardware board: a basic hinge and channel next to a branded soft-close one, with the price gap written beside each.

A compact display with three bays in a 500–700 sq ft shop in a tier-2 city can be built for roughly ₹4–9 lakh including lights and a stone top, as an estimate. Do not buy appliances outright. Ask a chimney, hob and sink dealer to place demo units in return for a display card, which is common practice in the trade; confirm the terms with each dealer.

Installation tools and the site van

Your fitters usually bring their own hand tools but expect you to supply the kit that is shared or expensive. Budget for it so jobs do not wait on a borrowed tool.

Estimates in ₹; used and Indian-made tools sit at the lower end. Check blade and bit compatibility before buying.
ToolUsed forBallpark cost
Hammer-drill with SDS bitsDrilling brick, concrete and hollow block for wall-unit hanging rails₹5,000–15,000
Cordless drill-driver, two batteriesFixing cams, hinges and handles without cable runs on site₹6,000–18,000
35 mm Forstner or cup-hinge boring bit and a jigRe-boring a hinge cup on site when a shutter is remade₹1,500–4,000
Jigsaw and a small circular sawTrimming plinth, filler panels and cutting hob or sink openings in a carcass top₹5,000–15,000
Trim router and an edge-trimming setDressing edge band and laminate on field-cut panels₹5,000–12,000
Silicone gun, hot-melt gun, clamps, panel lifterSealing joints near the sink, holding panels, lifting heavy tall units alone₹3,000–8,000
Dust extractor or shop vacuumHanding a clean kitchen to a client who has just finished painting₹6,000–15,000
Second-hand tempo or a rented pickupMoving boxed panels, plinth and tall units; panels are 8 by 4 ft and 18 mm thick₹1.5–3.5 lakh used, or per-trip hire

Rent a pickup per trip until you do four or five installations a month. Handling is the point of damage: a corner knock or a cracked edge band on the way up the stairs is a remake, so budget for corner protectors, blankets and stretch wrap as well.

Panel saw, edge bander, boring machine and CNC: the make-or-outsource decision

Every board you cut, edge and drill yourself saves job-work charges but ties up capital, floor space and a trained operator. The decision is driven by monthly volume, not ambition.

Rough ranges in ₹ for new Indian-made and imported entry-level machines; second-hand units cost less but carry service risk. Verify with dealers.
MachineWhat it doesBallpark costBuy when
Sliding table panel sawSquares and sizes 18 mm boards to the cut list with a clean edge; the base of every in-house line₹3–12 lakhOutsourced cutting costs or delays are hurting you most months
Automatic edge banderApplies PVC or ABS edge band with hot-melt glue and trims it; clean edges are what clients touch₹5–15 lakhYou do enough kitchens that edge quality needs control
Multi-spindle boring machineDrills the 32 mm system holes for shelf pins, cam fittings and dowels in one pass₹2–6 lakhHand drilling is the bottleneck on wardrobes
CNC routerCuts curves, handle grooves, hob openings and nested panels; also machines MDF shutters₹15–40 lakhYou are making your own shutters or odd shapes at volume
Air compressor, dust extraction, power backupPneumatic clamps and extraction on the line; most small units need three-phase power and a generator₹3–10 lakhWith the first machine, not later

Job-work cutting at a factory usually costs a few rupees per square foot of board for cutting, plus a rate per running foot for edge banding and per hole for drilling; rates vary widely by city, so get three quotes. A common rule of thumb is that a saw and edge bander start to make sense when you are doing around eight to twelve kitchens or equivalent wardrobes a month. Treat that as a starting estimate to test against your own invoices.

Machines also need space and compliance: a 1,500–3,000 sq ft unit, three-phase power, dust control and fire safety. If your operation crosses factory-law thresholds or needs pollution-board consent, the registration table in the playbook lists what to check with your state authorities.

What not to buy yet

  • Board and laminate stock. Sheets absorb moisture in a stockroom and colours get discontinued. Order per job against the client's advance, and hold only offcuts and a few popular colours of edge band.
  • A CNC router before you have a design library. CNC only pays if you are repeating profiles, handles and shutter styles; otherwise an outsourced job is cheaper.
  • Imported hardware by the carton. Stock the five or six SKUs you specify most (35 mm soft-close hinges, 450 mm and 500 mm soft-close channels, a few baskets) and buy the rest per job.
  • A large rendering workstation. A laptop with a discrete graphics card is enough until you have several jobs in design at the same time.
  • A fleet of vans. One pickup, hired by the trip, is cheaper than a vehicle idle between installations.

For a business that also sells loose furniture, the furniture business playbook has a different capital profile (showroom and stock), so keep the two budgets separate.

Working capital: the real cost

Your largest cash need is not equipment but the gap between buying materials and collecting the balance. A kitchen costing the client about ₹3 lakh can have ₹1.5–2 lakh of boards, hardware and stone already paid for before installation, and the final payment may arrive two weeks after handover.

An illustrative stage split to adapt, not a standard. Put your own split in the signed quotation.
StageTypical payment from client (estimate)Where your cash goes
Design approved and booking10–20%Site visits, drawings, deposit to the factory
Before production starts40–50%Boards, laminate, hardware and job-work
On delivery to site20–30%Transport, fitters' advance, stone fabricator
After installation and handoverBalance, 10–20%Snag fixing and warranty reserve

Keep a reserve of ₹3–6 lakh for a small studio so a late final payment on one job does not stop the next. If you want a simple way to track stage payments against each job, see the software page.

Paying for it

More on starting a modular kitchen business

Questions people ask

Do I need a panel saw to start a modular kitchen business?

No. Most new kitchen makers send cut lists to a processing factory that cuts, edge bands and drills boards for a job-work fee. Buy a panel saw and edge bander only once your own monthly volume is steady enough that factory delays or edge quality are costing you jobs, and you have space and three-phase power.

What hand tools does a kitchen installer need?

A hammer-drill with SDS bits, a cordless drill-driver, a laser line level, a spirit level, a jigsaw, a trim router, clamps, a silicone gun and a panel lifter. Fitters often bring hand tools, but the owner usually supplies the expensive shared ones. Budget about ₹30,000–80,000 for a set that keeps two fitters working without delays.

How big should a modular kitchen display be?

Small enough to build well. Two or three live bays in 500–700 sq ft is typical for a start: an L-shaped kitchen with a stone top, a tall-unit wall with pull-outs, and a wardrobe bay. Clients want to open drawers and feel hinges, so working fittings matter more than size or lighting.

Should I buy hardware in bulk for better rates?

Not at the start. Hardware ties up cash and variants get replaced, so stock a handful of fast-moving SKUs for warranty fixes and order the rest per job. Ask your distributor for a trade rate and for a part-return policy on unopened boxes. Stock more once monthly use of a part is predictable.

How much working capital does a kitchen business need?

Often more than the equipment. Boards, hardware and stone are paid for before the final instalment arrives, so a small studio typically needs a reserve of roughly ₹3–6 lakh. Stage payments tied to design approval, production and delivery reduce the strain. Treat these as planning estimates and test them against your first three jobs.

Menu

Read

Ask an expert Ask an expertFree, real peopleHub
Ask an expert